| | 2 minute read

Honda to build C$15B integrated CAM to EV complex in Canada

Integrated facility

Honda announced in April a C$15B investment into four plants in Ontario, Canada. Earmarked for operation in 2028, the integrated facilities will be one of the first of their kind.

Honda’s first EV plant will produce 240,000 vehicles per year in conjunction with a cell factory in Alliston, Ontario. Feeding the cell plant will be a cathode active materials plant, with JV partner POSCO Future M, and a separator plant, with JV partner Aahi Kasei Corporation.

아다마스의 견해:

The deal marks a momentous leap for the Japanese auto OEM which to date has been following compatriot Toyota’s lead into the hybrid-EV market. For Canada, this is a huge vote of confidence into the economic viability of large industrial projects, trumping the southern “rust-belt” neighbors for the bid.

By our estimates, if benchmarking with Honda’s Prologue model (85 kWh battery back), a 240,000 EV per annum facility could require roughly 26 GWh of cell capacity, 37 kt CAM capacity and 15 kt LCE in refined lithium chemicals, at steady state.

[5월호 발췌 EV 배터리 리튬 월간지 서비스 5월호 발췌.]


아다마스 인텔리전스의 애널리스트 크리스 윌리엄스

크리스는 아다마스 인텔리전스(Adamas Intelligence)의 애널리스트로, 글로벌 리튬 산업을 전문으로 담당하고 있습니다. 그는 리튬 가치 사슬을 연구하고 분석하여 고객사를 위한 실질적인 투자 기회를 발굴합니다.

크리스는 광업 및 석유·가스 운영 최적화 분야에서 11년의 경력을 쌓아왔으며, 데이터 기반의 심층적인 통찰력을 통해 실질적인 가치를 창출해 왔습니다. 그는 퀸즐랜드 대학교에서 기계공학을 전공하며 공학 학사 및 석사 학위를 취득했으며, 현재 브리티시컬럼비아 대학교에서 경영학 석사 과정을 수료 중입니다.


아다마스 인사이드로 돌아가기
아다마스 인사이드에 가입하세요
8